Specification
The stunning new double-height
glazed entrance provides access to an impressive reception
with a new lift for disabled access and a feature staircase
to the upgraded lift landing areas. |
> Introduction
> Floor Plans
> Space Plans
> Internal Gallery |
Quality Common Facilities
• Manned entrance reception
• 24 hour access and security
• New DDA compliant reception with waiting areas
• New lift for disabled access
• 3 No. high speed 13 person passenger lifts
• Goods lift to rear service core
• Refurbished tiled/carpeted lift landings and staircases
• Upgraded toilets with contemporary finishes
• New dedicated disabled toilet to each office floor
• New Costa Coffee unit at ground floor |
|
Office Areas
With its large deep span floorplates, No1 Tithebarn
now offers highly efficient and spacious accommodation capable
of high level user occupation. The space has been designed to
provide excellent natural and artificial lighting with the following
specification:
• Large deep span floorplates
• Modern exposed grid suspended ceilings
• LG3/LG7 semi-recessed lighting to a high specification
offering excellent uniformity
• 150mm metal encapsulated full access raised floor for
power and data
• 2,800mm height from raised floor to suspended ceiling
• Carpet tiled floors
• New perimeter radiator heating
• VAV comfort cooling and ventilation
> Download
detailed specification as PDF |